The Big Red Bus Club toilets need a make over!
We are looking for a reliable contractor to undertake refurbishing our toilets. The work needs to be carried out during February Half term and complete by 19th Feb 2024.
Click below for the full specification of the work needed. please contact nichola@thebigredbusclub.com for further information or to book in a site visit.
Full quotations need to be received by 11th December 2023
Big Red Bus Club Toilet Refurbishment
The Big Red Bus Club has received funding from The Royal Borough of Greenwich to refurbish the children and adult disabled toilets at The Big Red Bus Club in Charlton park.
The budget and time scales are tight and work must take place and be completed in February in two weeks where we can close for half term.
The toilets must be finished by the 19th February 2024.
Please do not tender for this work unless you can complete it within this time frame.
Specification
To refurbish both the children’s and adult disabled toilets.
Disabled Toilet
Updating existing disabled toilet to a modern toilet
Removal of existing disabled toilet and sanitaryware
Room insulated and plasterboarded
Surface mounted electrics and pipework
Instillation of on demand (non tank) hot water to sink
Installation of new disabled compliant toilet and sanitary ware and associated grab rails
Tile with BRBC supplied tiles to ¾
Removal of door, trimming to fit and refitting
Refitting existing drop down baby changing table
Fitting toilet roll holder, tissue holder and soap holder
Children’s toilets
Conversion of existing two stall children’s toilet to a family toilet with adult and children’s toilet and a large baby changing bench and storage.
Removal of all existing sanitary ware and cubicles
Room insulated and plasterboarded
Surface mounted electrics and pipework
Instillation of on demand (non tank) hot water to sink
Installation of New adult toilet and children’s toilet (BRBC Supplied)
Installation of sink at child level cold supply only
Tile with BRBC supplied tiles to ¾
Installation of a built in baby changing bench with under cupboard storage and built in sink with on demand hot water
Fitting 2 toilet roll holder,2 tissue holder and 2 soap holders
Removal and replacement of all new flooring for both toilets and hall floor like for like
Assumptions
The Big Red Bus Club will purchase the sanitaryware directly
The Big Red Bus Club will purchase the on demand water heaters
The contractor will purchase all other materials and transport to site
The Big Red Bus Club is a tricky site with limited access - vehicles can be bought into the park with care and with a member of Big Red Bus CLub on site - otherwise parking is available in Charlton Park Car Park.
Payment will be staged with 10% payable upfront 40% on completion of first weeks work 40% on completion of Second week's work and 10% once work has been signed off by our CEO as completed.
If you would like to tender for the work please contact nichola@thebigredbusclub.com to book a site visit. Images can also be sent.
Completed estimates must be submitted to Nichola@thebigredbusclub.com by midnight on the 11th December 2023
Estimates should include a full breakdown of costings
A copy of public liability insurance
2 contactable references for past projects
Contractors will be notified if they have been successful on Friday 15th December 2023.