The Big Red Bus Club toilets need a make over!

We are looking for a reliable contractor to undertake refurbishing our toilets. The work needs to be carried out during February Half term and complete by 19th Feb 2024.
Click below for the full specification of the work needed. please contact nichola@thebigredbusclub.com for further information or to book in a site visit.
Full quotations need to be received by 11th December 2023

Big Red Bus Club Toilet Refurbishment

The Big Red Bus Club has received funding from The Royal Borough of Greenwich to refurbish the children and adult disabled toilets at The Big Red Bus Club in Charlton park.

The budget and time scales are tight and work must take place and be completed in February in two weeks where we can close for half term. 

The toilets must be finished by the 19th February 2024. 


Please do not tender for this work unless you can complete it within this time frame.



Specification


To refurbish both the children’s and adult disabled toilets.


Disabled Toilet


Updating existing disabled toilet to a modern toilet 


  1. Removal of existing disabled toilet and sanitaryware

  2. Room insulated and plasterboarded 

  3. Surface mounted electrics and pipework

  4. Instillation of on demand (non tank) hot water to sink

  5. Installation of new disabled compliant toilet and sanitary ware and associated grab rails

  6. Tile with BRBC supplied tiles to ¾ 

  7. Removal of door, trimming to fit and refitting

  8. Refitting existing drop down baby changing table

  9. Fitting toilet roll holder, tissue holder and soap holder


Children’s toilets


Conversion of existing two stall children’s toilet to a family toilet with adult and children’s toilet and a large baby changing bench and storage.


  1. Removal of all existing sanitary ware and cubicles

  2. Room insulated and plasterboarded 

  3. Surface mounted electrics and pipework

  4. Instillation of on demand (non tank) hot water to sink

  5. Installation of New adult toilet and children’s toilet (BRBC Supplied)

  6. Installation of sink at child level cold supply only

  7. Tile with BRBC supplied tiles to ¾ 

  8. Installation of a built in baby changing bench with under cupboard storage and built in sink with on demand hot water

  9. Fitting 2 toilet roll holder,2 tissue holder and 2 soap holders


  1. Removal and replacement of all new flooring for both toilets and hall floor like for like




Assumptions


The Big Red Bus Club will purchase the sanitaryware directly 

The Big Red Bus Club will purchase the on demand water heaters

The contractor will purchase all other materials and transport to site

The Big Red Bus Club is a tricky site with limited access - vehicles can be bought into the park with care and with a member of Big Red Bus CLub on site - otherwise parking is available in Charlton Park Car Park.

Payment will be staged with 10% payable upfront 40% on completion of first weeks work 40% on completion of Second week's work and 10% once work has been signed off by our CEO as completed.







If you would like to tender for the work please contact nichola@thebigredbusclub.com to book a site visit. Images can also be sent.



Completed estimates must be submitted to Nichola@thebigredbusclub.com by midnight on the  11th December 2023 

Estimates should include a full breakdown of costings

A copy of public liability insurance

2 contactable references for past projects


Contractors will be notified if they have been successful on Friday 15th December 2023.